March 10, 2025
Part 2: Strategies for Plug & Process Loads (Plug-in and Permanently Wired Electric Equipment) (2-5 LEED Points)
Even though plug and process loads are one of the most important factors for LEED energy points, they are often overlooked. This category includes everything that is plugged into a wall and other permanent equipment like elevators, walk-in refrigerators, and ventilation fans that are not part of an HVAC system. (It does not include lights and water heating) The reason why this category is often overlooked in the pursuit of LEED energy points is because...