Services
AboutFree LEED Energy GuideContact

Energy Design Guidelines Most Engineers and Architects Don’t Know  That Can Earn Most LEED Projects 2-12 More Points

March 10, 2025
Part 2:  Strategies for Plug & Process Loads (Plug-in and Permanently Wired Electric Equipment) (2-5 LEED Points)

Even though plug and process loads are one of the most important factors for LEED energy points, they are often overlooked. This category includes everything that is plugged into a wall and other permanent equipment like elevators, walk-in refrigerators, and ventilation fans that are not part of an HVAC system. (It does not include lights and water heating)‍ The reason why this category is often overlooked in the pursuit of LEED energy points is because...

February 10, 2025
Part 1: HVAC Selection (4-10 LEED Points)

The idea for this guide came after repeated experience while doing energy modeling for LEED: most projects I worked on (even high-profile ones that looked good on paper) unnecessarily missed the opportunity for 4-12, or sometimes even more LEED energy points. ‍This could have been prevented in two ways:

March 10, 2025
test

Join our energy & daylighting education mailing list
Thank you! We'll reach out soon
Oops! Something went wrong while submitting the form.
Company
HomeAboutLEED Energy CourseContact
Social media
Linkedin